FIGURE 6
PMD limit of GBAS/INS during pre-coasting computed for the taxiway with respect to the GBAS monitoring performance for (a) GAST D, (b) GAST F under Case A (rsat = 3×10−5/h), and (c) GAST F under Case B (rsat = 1×10−5/h)
PMD limit of GBAS/INS during pre-coasting computed for the taxiway with respect to the GBAS monitoring performance for (a) GAST D, (b) GAST F under Case A (rsat = 3×10−5/h), and (c) GAST F under Case B (rsat = 1×10−5/h)