TABLE 2

Power Ratio for the Two Proposed Modified CEMIC Options

SignalPresent IRNSS signalModified CEMIC Option-1Modified CEMIC Option-2
Power (%)PhasePower (%)PhaseChange (dB)Power (%)PhaseChange (dB)
RS Data44.44Q39.12Q−0.5540.84Q−0.37
RS Pilot22.22I19.57I−0.5516.27I−1.35
SPS Data22.22I19.57I−0.5516.27I−1.35
Additional Signal-I10.65I-16.27I-
IM Signal11.11Q4.69Q−3.756.68Q−2.2
-I6.4I-3.67I-